1. Home
  2. Services

Electrical services · Chicago, IL

Panel upgrades, conduit rewiring and EV chargers in Chicago, scoped before we start.

Six kinds of work in Chicago houses, two-flats and small storefronts. Each one below gets its own photograph, the scope, the materials, what the written quote covers and how long it takes. No prices printed. The quote after a visit is the number.

Raceway: EMT or armored cable Permit: filed by us Quote: fixed, written, itemized Base: 60618
New 200 amp panel with breakers being wired in a Chicago basement during a service upgrade
Panel swap, basement, conductors landing through metal connectors
01

Panel and service upgrades

200 amp service upgrade in Chicago, meter appointment booked by us.

Most panels we pull out are 60 or 100 amps, put in when the house had a fridge, some lights and a radio. Now it has an induction range, two window units, a dryer and someone asking about a car charger. A 100 amp panel feeding all of that is not a panel. It is a fuse waiting for August.

We take the service to 200 amps with a new panel and breakers that are actually listed for that panel. Wrong-brand breakers in the bus are the single most common thing we find when someone else did the swap, and they are an inspection failure every time. Where the utility requires it, the meter socket and the service mast are replaced too. On older brick two-flats they often are.

Most service upgrades are one working day with the power off, plus the utility's meter appointment, which we book. If you run a sump pump or medical equipment, say so at the visit and we plan the cutover around it.

Price basis Fixed written quote after a site visit

Panel, permit and meter booking

  • Panel, breakers by type and count, grounding and bonding
  • Electrical permit and the City inspection
  • Utility disconnect and reconnect, booked by us
  • A legible handwritten panel directory

What moves the number

Where the meter sits, whether the mast has to move, how far the new panel lands from the old one, and how many circuits need AFCI or GFCI breakers under current code.

Spec · Panel and service upgrades
Service size60A or 100A up to 200A, load calculation done at the visit
PanelNew panel, model named on the quote, breakers listed for it
Meter socket and mastReplaced where the utility requires it
GroundingGround rods and water-pipe bond checked, redone where missing
Lead timeQuote within about two working days of the visit; install day set around the utility's meter slot
Power offOne working day, most of it
Original knob-and-tube wiring on ceramic knobs in a joist bay, opened up for a conduit rewire
Knob-and-tube found in a joist bay, coming out
02

Rewiring in EMT conduit

Knob and tube rewiring in Chicago, pulled in metal.

Knob-and-tube in a 1920s two-flat is normal. Insulation blown over it is the problem. Those conductors were meant to shed heat into open air; pack cellulose around them and they cook slowly for decades. The other common find is ungrounded cloth cable from the forties and fifties, with three-prong receptacles screwed onto two-wire circuits so the place looks updated.

Chicago electrical code wants conduit. We replace those circuits with THHN copper pulled in EMT, or armored cable where we are fishing a closed plaster wall and code allows it. One floor at a time, so the upstairs unit keeps power while the garden unit is opened, and every night there is a working circuit for the fridge and the furnace.

Conduit rewiring cost in Chicago depends more on the walls than the wire. Lath and plaster cracks if you open it carelessly, so we cut tight access holes along a plan. We cut the holes. We patch the holes. You paint.

Price basis Fixed quote per floor after a walk-through

Circuits, raceway and patch-back

  • Every circuit by gauge and breaker
  • Raceway, boxes, devices and the permit
  • Patch-back of our openings to paint-ready

Why we open boxes first

At the walk-through we pull two or three devices. What sits behind them decides whether a floor is a fish job or an open-wall job, and that is most of the price difference.

Spec · Rewiring in EMT conduit
RemovedKnob-and-tube and ungrounded cloth cable, abandoned runs made dead
ConductorTHHN copper: 12 AWG on 20A circuits, 14 AWG on 15A
RacewayHalf-inch and three-quarter EMT, set-screw fittings, metal boxes
ProtectionAFCI on living and bedroom circuits, GFCI in wet locations
Lead timeSeveral working days per floor, stated per floor on the quote
PatchingSet, sanded, paint-ready. Paint is yours.
Level 2 EV charger mounted on a brick garage wall with its dedicated circuit run in metal conduit
Detached garage, conduit run to the charger and its disconnect
03

Level 2 EV charger circuits

EV charger installation in Chicago starts with a load calculation.

A Level 2 charger wants a dedicated 240V circuit, typically on a 40A or 50A breaker. Wire gauge and breaker follow the charger's listing, not a rule of thumb. Before anyone talks about which wall it goes on, we run the load calculation on your service. On a 100 amp house with gas heat it often works. On a 100 amp house with an electric range and central air it often does not, and then the honest options are a lower charge setting, a load-management device the charger maker supports, or a service upgrade.

Chicago garages are often detached, at the back of the lot across a yard. That means a trench or an overhead run, conduit the whole way, and a disconnect at the garage. Run length is the biggest line on the quote. We install the circuit and mount the unit you bought. We do not sell chargers.

Price basis Range from a panel photo and run length, confirmed on site

Send us

  • A photo of the panel label: brand, amperage, open slots
  • The charger model, or the one you are looking at
  • Rough distance from panel to parking spot

From load calculation to inspection

Load calculation in writing, the breaker, conductors, raceway, any disconnect, mounting the unit, the permit and the inspection.

Spec · Level 2 EV charger circuits
CircuitDedicated 240V, typically 40A or 50A breaker, sized to the charger's listing
TerminationHardwired unit, or a receptacle where the charger is listed for one
RacewayEMT indoors; underground run to code for detached garages
Load calculationDone first, shown to you on paper
Lead timeAttached garage: about a day. Detached: longer, by trench length
Kitchen ceiling with newly installed recessed LED lights and a step ladder against the wall
Kitchen ceiling, wafers on a measured grid
04

Lighting and devices

Recessed lighting installation in Chicago, laid out with a tape.

A crooked row of lights is what you stare at for the next fifteen years. So the layout gets done with a tape and a chalk line, not by eye. We find the joists, mark the grid, and show you the marks before a single hole is cut. The counter edge gets light; the middle of the floor is not a spotlight.

Most kitchens get slim LED wafers. They sit under a joist without a housing and fish into plaster ceilings with less damage. The flicker complaint we fix most often is a dimmer that does not match the LED driver, so we check the fixture's compatibility list before ordering. Same visit covers GFCI and AFCI protection and dedicated 20A kitchen counter circuits on 12 AWG.

Price basis Per fixture and per device, itemized on the written quote
Spec · Lighting and devices
FixturesLED wafers or housings; trim and color temperature your call
ControlsDimmers checked against the driver compatibility list
Kitchen circuitsDedicated 20A on 12 AWG, GFCI where code calls for it
New circuitRun in EMT, a separate line on the quote
Lead timeOne to two days for a kitchen; longer on plaster with no attic access
PatchingOur ceiling openings patched paint-ready
Multimeter probes testing a pulled receptacle in an old metal box during fault-finding
Warm outlet, back-stab connections, meter on it
05

Troubleshooting and repair

Breaker keeps tripping in Chicago? Stop resetting it.

If the breaker trips twice, stop resetting it. A breaker that trips is doing its job; the question is why. Usually it is an overloaded circuit, a failing device, or a loose connection heating up behind a plate. The one we find most often is a back-stabbed receptacle, the wire pushed into a spring clip instead of wrapped on the screw, scorched brown after years of a space heater.

Electrical repair in Chicago starts with a diagnostic visit: meter, thermal check where it helps, and the device pulled out of the wall. Then you get the repair quoted before anything else happens. Dead circuits, warm outlets, flicker when the AC kicks on. Traced to the cause, not reset and left. If anything smells hot, turn that circuit off and call 312-284-7542.

Price basis Diagnostic visit first, repair quoted before any work
Spec · Troubleshooting and repair
SymptomsTripping breakers, dead circuits, warm outlets, flicker
MethodMeter on the circuit, devices pulled, connections checked to the panel
RepairsDevices replaced and screw-terminated, splices remade in boxes
Lead timeDiagnostic visit booked by phone; repair often the same visit once you approve the quote
Exposed EMT conduit bent along a brick wall in a commercial build-out with a hand bender on a ladder
Exposed EMT on brick, offsets matched
06

Small commercial build-outs

Commercial electrician in Chicago for storefronts and offices.

Tenant build-outs, storefront lighting, a coffee bar that needs several dedicated 20A lines and a bigger one for the espresso machine. In an exposed-brick space the conduit is on show, so it has to look right: EMT bent on site, offsets matched, straps on even spacing, boxes plumb.

We quote from your drawings if you have them, from a walk-through if you do not. Equipment circuits are sized from the nameplates, not from a guess. Exit and emergency lighting gets tied in. At handover the panel schedule is updated and typed. We work to your opening date and the landlord's access rules, and the quote says which days the space is without power. We do not do fire alarm or data cabling; we run the power those trades need and coordinate with them.

Price basis Quoted from drawings or a walk-through
Spec · Small commercial build-outs
ScopeLighting, receptacle layouts, dedicated equipment circuits, exit and emergency lighting tie-ins
RacewayEMT bent on site, run exposed where the space calls for it
Equipment circuitsSized from nameplate ratings, dedicated where the maker requires
HandoverTyped panel schedule, every breaker labeled
Lead timeSet against your opening date; power-off days stated in writing

Chicago electrical code, conduit

Why the Chicago number is higher than the online guide.

National cost guides are written for places where plastic-sheathed cable gets stapled to a stud and the wall closes the same afternoon. Chicago does not accept that for most work. Wiring goes in metal raceway: EMT, or armored cable where it is allowed.

Chicago wants metal around the wire. We price it that way from the first visit, so the quote does not grow at inspection.
  1. Material

    A foot of EMT costs more than a foot of cable

    That is the small part of the difference. Fittings, straps and metal boxes add to it.

  2. Labor

    Every bend is measured and made on site

    Every pull goes through a pipe, and conduit does not fish a closed plaster wall the way cable does. So more wall gets opened, and patched.

  3. Failed?

    Electrical inspection failed in Chicago

    A job quoted in plastic cable inside the city fails. We correct it in conduit, rebook the inspector and hand you the closed permit. See how we work.

Next step

Send us a photo of the panel label. We will book the visit.